Projects Timeline


Infrastructures

January 2009 - September 2013:
Project and Construction Manager,ERMON S.A.
Projects:
  • Construction of waste water collection system and installation of two prefabricated pumping stations in Emporeio community, Santorini Island, Greece.
  • Bid Budget: 630,000 €.
    Construction Manager,ERMON S.A.
  • Construction of waste water collection system and installation of five prefabricated pumping stations, in Municipality of Hora Androu, Andros Island, Greece.
  • Bid Budget: 2,204,000€
    Project and Construction Manager, ERMON S.A.(public contractors).
  • Water supply and sanitation. Construction of urban water network supply and waste water collection system, in Megalohori and Akrotiri community, Santorini Island, Greece.
  • Bid Budget: 1,820,000 €

    March 2012 - June 2012:
    Independent Civil engineer.
    Client: Ermon SA
  • Consultant and Pre-cost estimator for the participation in the tender process of the project "Construction of waste water collection system and installation of five prefabricated pumping stations in Municipality of Hora Androu, Andros Island. Successful Tenders.
  • Bid Budget 2,204,000 €

    March 2012 - April 2012:
    Independent Civil engineer.
    Client: NAMA Consulting Engineers and Planners SA
  • Study of storm water collection network in Messaria and Messaria-Karterados, Communities of Santorini Island. Total Length= 1.540 meters. Sewage: PVC Φ200mm.
    Services:
    Involved in Altimetric and Topo surveys. Ensure Autocad formatting/ road's long and cross-sections/ drawings of details/ quantities of materials. Pre-cost estimation and preparation of documents for the bidding process.
  • February 2012 - March 2012:
    Independent Civil engineer.
    Client: DEYA Thira (Public Water and Sewerage Company), Santorini
    Project:
  • Study of storm water collection network in Fira, Community of Santorini Island. Total Length= 680 meters through alleys and narrow roads. Sewage: PVC Φ200mm.
  • September 2011 - October 2011:
    Independent Civil engineer.
    Client: DEYA Thira (Public Water and Sewerage Company), Santorini, Greece
    Third Party associate, Technical consultant, Project director and Technical Advisor to DEYA Thiras (Public Water and Sewerage Company, Santorini), on a variety of projects with main objectives the improvement and expansion of the waste water collection network, water supply and storm water collection and drainage. Projects:
  • Study of waste water collection system and installation of wo prefabricated pumping stations in Emporeio, Community of Santorini Island, Length=4.800 meters of piping network through alleys and narrow roads.
    Total bid budget of the projects I handled
  • Bid Budget 610,000 €

    Plants and Facilities

    January 2009 - September 2013:
    Project & Construnction Manager, ERMON S.A.
    Projects:
  • Infrastructure and installation of pre-fabricated sea water desalination plants in Fira, Santorini Island, Greece. —design & construction project
  • Bid Budget: 2,500,000 €
  • Installation of biological sewage treatment plant in the archaeological area of Akrotiri, Santorini Island, Greece.
  • Bid Budget: 300,000 €

    August 2012 - September 2012:
    Independent Civil engineer and contractor.
    Client: Santorini Boatmen Union
  • Project: Design and construction of a mobile hangar for the shipbuilding needs of the Union. I developed a roofing system using traditional Greek scaffolding, light trusses and PVC-canvas. Clear span of 17.00m, 7.50m height and 30.0m width, wind and snow load designed.
  • January 2009 - September 2013:
    Construction Manager, ERMON S.A.
  • Construction of biological sewage treatment plant and the subsea pipeline of tertiary sewage disposal, in Municipality of Hora Androu, Andros Island, Greece. —design & construction project.
  • Bid Budget: 9,270,000 €

    HSE

    March 2012 - to date:
    Associate HSE.
    Client: Ergoasfaleia SA, Health and Safety Consulting Company
  • Coordinator and responsible for health and safety at work, in two jewelry manufacturing industries.
  • Military Projects

    November 2007 - January 2009:
    Site Manager assistant and Construction Engineer J/V: Energodynamiki
  • Construction of hangar for aircraft maintenance, command center, infrastructure and development projects of the 335 st squadron of 116 Combat Wing. In Araxos, Kato Achaia, Greece.
  • Bid Budget: 6.350.000 €.  Final 8.130.000 €.

    November 2007:
    Independent engineer and contractor.
  • Construction of sidewalk paving and the surrounding area of 335 Squadron, 116 Combat Wing in Araxos Kato Achaia.
  • Residential

    February 2012 - March 2012:
    Independent Civil engineer and contractor.
    Client: Stefanos Papadimitropoulos
  • Renovation of a café in Fira/ Santorini named "San Remo".
  • August 1997 - February 2006:
    Management and administration of the family business, Paving and building contractors
    Projects:
  • Variety of more than 39 small and medium Residential and Public Projects.
    Field of applications: Stonemasonry, Plasterworks, Bricklaying, Formworks, Plasterboards, Paintings, Tiles, Polished Concrete, Building thermal insulation ~ According to the rules of HACCP
  • September 2003 - March 2004:
    Foreman and construction engineer, Sinergon – G.Limas & Co. G.P.
    Projects:
  • Design- Construction of multiple Six storeys Residential Buildings in Athens, Greece.
  • Buildings

    March 2001 - November 2002:
    Civil Forman of concrete structures, pilling and formworks at Stefanos Pantelias W.L.L. (r/c contractor).
    Projects:
  • Construction of Bank of Greece/ National Mint, Athens, Greece.
  • Construction of Ministry of Culture/ Revenue L.Mesogeion, Athens, Greece.
  • Hotel

    October 1998 - November 2000:
    Civil Forman of concrete structures, slurry walls and formworks at J/V Chris Nikolaidis- Michael Hatzopoulos (r/c and earthworks contractors).
    Contractor: Chris Nikolaidis and Michael Hatzopoulos
    Projects:
  • Construction of Club Hotel Casino in Loutraki, Greece.
  • A perimeter of 820 meters deep reinforced slurry walls applied at an area of 35,600 sq.m. right next to the beach.

    Projects Under Development

    September 2012- to date:
  • Design and develop of roofing and scaffolding system using, light trusses and PVC-canvas.
  • January 2012 - to date
    Team leader in a software development project on Road Maintenance Management for Android, i-Phone and i-Pad operating systems.